(Changed production release)
(complete rewrite.)
Line 1: Line 1:
<span style="color: Green">NOTE: The [[BOARD18 Development History]] has been moved to a separate set of pages.</span>
<span style="color: Green">NOTE: The [[BOARD18 Development History]] has been moved to a separate set of pages.</span>


<span style="color: Green">With the release of version 2.4.3 on December 5, 2016, BOARD18 has become a mature product.</span><br>
<span style="color: Green">With the release of version 2.4.3 on December 5, 2016, BOARD18 became a mature product.</span><br>
The BOARD18 project is shifting to a maintenance mode. No new development is anticipated at
At that point the BOARD18 project shifted to a maintenance mode, though some minor enhancements were done over the next year.<br>
this time; though some minor enhancements may be done. I am going to devote some of my time to the
Also, the design document has been extensively updated and a number of [[Dream Spreadsheets]] have been written.<br><br>
upgrading of documentation [especially the design document].
Release 2.5.2 is now the the production status release of BOARD18.<br><br>
 
Some new development is anticipated in the second quarter of 2018 but no detailed time-line for it currently exists.
Release 2.4.7 is now the the production status release of BOARD18.


==The Long Term==
==The Long Term==
To be determined.
To be determined.

Revision as of 14:06, 11 April 2018

NOTE: The BOARD18 Development History has been moved to a separate set of pages.

With the release of version 2.4.3 on December 5, 2016, BOARD18 became a mature product.
At that point the BOARD18 project shifted to a maintenance mode, though some minor enhancements were done over the next year.
Also, the design document has been extensively updated and a number of Dream Spreadsheets have been written.

Release 2.5.2 is now the the production status release of BOARD18.

Some new development is anticipated in the second quarter of 2018 but no detailed time-line for it currently exists.

The Long Term

To be determined.